Matrix view

This page lists all Shift2rail projects. You can also apply various filters to this list.

Project ID Project title Call reference Period Project value
arcc.pngARCCAutomated Rail Cargo Consortium: Rail freight automation research activities to boost levels of quality, efficiency and cost effectiveness in all areas of rail freight operationsH2020-S2RJU-CFM-2015-01-101/09/2016 - 31/08/2019€ 3 600 360,00
ASTRAIL.pngASTRAILAstRailH2020-S2RJU-OC-201701/09/2017 - 31/08/2019€ 1 797 307,50
ATTRACKTIVE.pngATTRACKTIVEAdvanced Travel Companion and Tracking ServicesS2R-CFM-IP4-02-201501/09/2016 - 31/12/2018€ 5 059 579,00
CO-ACTIVE.pngCO-ACTIVECO-modal journey re-ACcommodation on associated Travel serVicesS2R-CFM-IP4-01-201501/09/2016 - 31/12/2018€ 7 818 365,21
cohesive.pngCOHESIVE COHErent Setup and Demonstration of Integrated Travel SerVicesH2020-S2RJU-CFM-201701/09/2017 - 30/06/2022€ 4 039 491,45
CONNECTA.pngCONNECTACONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1.S2R-CFM-IP1-02-201601/09/2016 - 31/08/2018€ 13 291 983,55
cb0dtltw1aj.pngCONNECTA-2CONNECTA 2S2R-CFM-IP1-02-2018To be confirmed€ 10 575 888,84
connective.pngCONNECTIVEConnecting and Analysing the Digital Transport Ecosystem SR2-CFM-IP4-01-201701/09/2017 - 30/06/2022€ 7 906 243,00
CYRAIL.pngCYRAILCybersecurity in the RAILway sectorS2R-OC-IP2-01-201501/10/2016 - 30/09/2018€ 1 498 150,00
DESTINATE.pngDESTINATEDecision supporting tools for implementation of cost-efficient railway noise abatement measuresS2R-OC-CCA-03-201501/11/2016 - 31/10/2018€ 1 271 812,50
dynafreight.pngDYNAFREIGHTInnovative technical solutions for improved train DYNAmics and operation of longer FREIGHt TrainsS2R-OC-IP5-02-201501/11/2016 - 30/06/2018€ 999 822,50
etalon.pngETALONEnergy Harvesting for Signalling and CommunicationS2R-OC-IP2-02-201701/09/2017 - 31/01/2020€ 1 699 998,75
FairStations.pngFAIRSTATIONSFair StationsH2020-S2RJU-OC-201701/09/2017 - 31/08/2019€ 1 199 875,00
FFL4E.pngFFL4EFuture Freight Loco for EuropeS2R-CFM-IP5-03-201501/09/2016 - 31/08/2019€ 3 375 017,00
fine1.pngFINE 1Future Improvement for Energy and NoiseS2R-CFM-CCA-02-201501/09/2016 - 31/08/2019€ 3 017 281,68
FR8HUB.pngFR8HUBReal time information applications and energy efficient solutions for rail freightS2R-CFM-IP5-01-201701/09/2017 - 31/08/2020€ 9 900 990,00
FR8RAIL.pngFR8RAILDevelopment of Functional Requirements for Sustainable and Attractive European Rail FreightS2R-CFM-IP5-01-201501/09/2016 - 31/08/2019€ 7 826 783,00
tblzllygjgg.pngFR8RAIL IIDigitalization and Automation of Freight RailS2R-CFM-IP5-01-2018To be confirmed€ 12 375 552,16
gof4r.pngGOF4RGovernance of the Interoperability Framework for Rail and Intermodal MobilityS2R-OC-IP4-01-201601/11/2016 - 31/10/2018€ 2 000 000,00
gosaferail.pngGOSAFE_RAILGlobal Safety Management Framework for RAIL OperationsS2R-OC-CCA-04-201501/10/2016 - 30/09/2019€ 1 298 750,00
IMPACT-1.pngIMPACT-1Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 1S2R-CFM-CCA-01-201501/09/2016 - 28/02/2018€ 886 819,00
IMPACT-2.jpgIMPACT-2Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 2 S2R-CFM-CCA-01-201701/09/2017 - 31/08/2022€ 7 102 821,00
in2dreams.pngIN2DREAMSIN2DREAMS (INtelligent solutions 2ward the Development of Railway Energy and Asset Management Systems in Europe)H2020-S2RJU-OC-201701/09/2017 - 31/08/2019€ 2 195 715,00
IN2SMART.pngIN2SMARTIntelligent Innovative Smart Maintenance of Assets by integRated TechnologiesS2R-CFM-IP3-02-201601/09/2016 - 31/08/2019€ 16 405 562,56
IN2STEMPO.pngIN2STEMPOInnovative Solutions in Future Stations, Energy Metering and Power SupplyS2R-CFM-IP3-01-201701/09/2017 - 31/08/2022€ 13 440 000,00
IN2TRACK.pngIN2TRACKResearch into enhanced tracks, switches and structuresS2R-CFM-IP3-01-201601/09/2016 - 28/02/2019€ 6 366 942,00
iufsj3j3jan.pngIN2TRACK2Research into enhanced track and switch and crossing system 2S2R-CFM-IP3-01-2018To be confirmed€ 30 162 671,14
innowag.pngINNOWAGINNOvative monitoring and predictive maintenance solutions on lightweight WAGonS2R-OC-IP5-03-201501/11/2016 - 30/04/2019€ 1 500 562,50
prtvssp51ud.pngMAASIVEPassenger service platform specifications for an enhanced multi-modal transport eco-system including Mobility as a Service (MaaS)S2R-CFM-IP4-01-2018To be confirmed€ 11 692 236,26
mat4rail.pngMAT4RAILMat4railS2R-OC-IP1-01-201701/10/2017 - 30/09/2019€ 3 500 000,00
MISTRAL.pngMISTRALCommunication Systems for Next-generation RailwaysS2R-OC-IP2-03-201501/11/2016 - 31/10/2018€ 499 282,50
momit.pngMOMITMOMIT (Multi-scale observation and monitoring of railway infrastructure threats)H2020-S2RJU-OC-201701/09/2017 - 31/08/2019€ 599 172,50
my-trac.pngMY-TRACMy-TRACS2R-OC-IP4-01-201701/09/2017 - 31/08/2019€ 3 494 476,25
NEAR2050.pngNEAR2050Future challenges for the rail sectorS2R-OC-CCA-01-201501/10/2016 - 31/03/2018€ 399 891,25
OPEUS.pngOPEUSModelling and strategies for the assessment and OPtimisation of Energy USage aspects of rail innovationS2R-OC-CCA-02-201501/11/2016 - 30/04/2019€ 797 130,00
optiyard.pngOPTIYARDOptiYard - Optimised Real-time Yard and Network ManagementS2R-OC-IP5-01-201701/10/2017 - 30/09/2019€ 1 499 900,00
PINTA.pngPINTA IP1 Traction TD1 and Brakes TD5 – Phase 1S2R-CFM-IP1-01-201601/09/2016 - 30/11/2018€ 29 201 993,71
324f0g2mjkv.pngPINTA2IP1 Traction TD1 and Brakes TD5 – Phase 2S2R-CFM-IP1-01-2018To be confirmed€ 28 534 183,73
pivot.pngPIVOTPerformance improvement for vehicles on trackS2R-CFM-IP1-01-201701/10/2017 - 30/09/2019€ 18 901 890,00
plasa.pngPLASASmart Planning and Safety for a safer and more robust European railway sectorS2R-CFM-CCA-03-201501/09/2016 - 31/08/2018€ 786 349,00
itghca53zso.pngPLASA-2Smart Planning and Virtual CertificationS2R-CFM-CCA-01-2018To be confirmed€ 1 853 347,78
run2rail.pngRUN2RAILRUN2RAILS2R-OC-IP1-02-201701/09/2017 - 31/08/2019€ 2 732 463,75
SAFE4RAIL.pngSAFE4RAILSAFE architecture for Robust distributed Application Integration in roLling stockS2R-OC-IP1-02-201601/10/2016 - 30/09/2018€ 6 681 211,25
S-CODE.PNGS-CODESwitch and Crossing Optimal Design and EvaluationS2R-OC-IP3-01-201601/11/2016 - 31/10/2019€ 4 999 771,25
smart.pngSMARTSmart Automation of Rail TransportS2R-OC-IP5-01-201501/10/2016 - 30/09/2019€ 999 598,75
SMARTE.pngSMARTESMaRTE - Smart Maintenance and the Rail Traveller ExperienceS2R-OC-CCA-01-201701/09/2017 - 31/08/2019€ 769 958,75
st4rt.pngST4RTSemantic Transformations for Rail Transportation S2R-OC-IP4-02-201601/11/2016 - 31/10/2018€ 1 000 000,00
VITE.pngVITEVirtualisation of the testing environmentS2R-OC-IP2-02-201501/11/2016 - 31/10/2018€ 1 008 826,25
X2RAIL-1.PNGX2RAIL-1Start-up activities for Advanced Signalling and Automation SystemsS2R-CFM-IP2-01-201501/09/2016 - 31/08/2019€ 45 003 870,33
X2rail-2.pngX2RAIL-2Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functionsS2R-CFM-IP2-01-201701/09/2017 - 31/08/2020€ 30 152 828,03
031wgqc0h1q.pngX2RAIL-3Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communicationS2R-CFM-IP2-01-2018To be confirmed€ 38 885 434,82