 | ARCC | Automated Rail Cargo Consortium: Rail freight automation research activities to boost levels of quality, efficiency and cost effectiveness in all areas of rail freight operations | H2020-S2RJU-CFM-2015-01-1 | 01/09/2016 - 31/08/2019 | € 3 600 360,00 |
 | ASSETS4RAIL | Measuring, monitoring and data handling for railway assets; bridges, tunnels, tracks and safety systems | S2R-OC-IP3-01-2018 | 01/12/2018 - 31/05/2021 | € 5 506 631,25 |
 | ASTRAIL | AstRail | H2020-S2RJU-OC-2017 | 01/09/2017 - 31/08/2019 | € 1 797 307,50 |
 | ATTRACKTIVE | Advanced Travel Companion and Tracking Services | S2R-CFM-IP4-02-2015 | 01/09/2016 - 31/12/2018 | € 5 059 579,00 |
 | B4CM | Blockchains as a Distributed Ledger for Attribution of RCM Data in Rail | S2R-OC-IPX-03-2018 | 01/12/2018 - 30/11/2021 | € 124 951,25 |
 | CO-ACTIVE | CO-modal journey re-ACcommodation on associated Travel serVices | S2R-CFM-IP4-01-2015 | 01/09/2016 - 31/12/2018 | € 7 818 365,21 |
 | COHESIVE | COHErent Setup and Demonstration of Integrated Travel SerVices | H2020-S2RJU-CFM-2017 | 01/09/2017 - 30/06/2022 | € 4 039 491,45 |
 | CONNECTA | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. | S2R-CFM-IP1-02-2016 | 01/09/2016 - 31/08/2018 | € 13 291 983,55 |
 | CONNECTA-2 | CONNECTA 2 | S2R-CFM-IP1-02-2018 | 01/10/2018 - 31/03/2021 | € 10 575 888,84 |
 | CONNECTIVE | Connecting and Analysing the Digital Transport Ecosystem | SR2-CFM-IP4-01-2017 | 01/09/2017 - 30/06/2022 | € 7 906 243,00 |
 | CYRAIL | Cybersecurity in the RAILway sector | S2R-OC-IP2-01-2015 | 01/10/2016 - 30/09/2018 | € 1 498 150,00 |
 | DESTINATE | Decision supporting tools for implementation of cost-efficient railway noise abatement measures | S2R-OC-CCA-03-2015 | 01/11/2016 - 31/10/2018 | € 1 271 812,50 |
 | DYNAFREIGHT | Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains | S2R-OC-IP5-02-2015 | 01/11/2016 - 30/06/2018 | € 999 822,50 |
 | EMULRADIO4RAIL | EMULATION OF RADIO ACCESS TECHNOLOGIES FOR RAILWAY COMMUNICATIONS | S2R-OC-IP2-03-2018 | 01/12/2018 - 31/05/2020 | € 748 097,50 |
 | ETALON | Energy Harvesting for Signalling and Communication | S2R-OC-IP2-02-2017 | 01/09/2017 - 31/01/2020 | € 1 699 998,75 |
 | FAIRSTATIONS | Fair Stations | H2020-S2RJU-OC-2017 | 01/09/2017 - 31/08/2019 | € 1 199 875,00 |
 | FFL4E | Future Freight Loco for Europe | S2R-CFM-IP5-03-2015 | 01/09/2016 - 31/05/2019 | € 3 375 017,00 |
 | FINE 1 | Future Improvement for Energy and Noise | S2R-CFM-CCA-02-2015 | 01/09/2016 - 31/08/2019 | € 3 017 281,68 |
 | FLEX-RAIL | Paradigm shifts for railway – Technology uptake strategies for a lean, integrated and flexible railway system | S2R-OC-IPX-01-2018 | 01/12/2018 - 30/06/2021 | € 1 099 230,00 |
 | FR8HUB | Real time information applications and energy efficient solutions for rail freight | S2R-CFM-IP5-01-2017 | 01/09/2017 - 31/08/2020 | € 9 900 990,00 |
 | FR8RAIL | Development of Functional Requirements for Sustainable and Attractive European Rail Freight | S2R-CFM-IP5-01-2015 | 01/09/2016 - 31/08/2019 | € 7 826 783,00 |
 | FR8RAIL II | Digitalization and Automation of Freight Rail | S2R-CFM-IP5-01-2018 | 01/05/2018 - 30/04/2021 | € 12 375 552,16 |
 | GATE4RAIL | GNSS Automated Virtualized Test Environment for RAIL | S2R-OC-IP2-02-2018 | 01/12/2018 - 30/11/2020 | € 1 019 993,75 |
 | GOF4R | Governance of the Interoperability Framework for Rail and Intermodal Mobility | S2R-OC-IP4-01-2016 | 01/11/2016 - 31/10/2018 | € 2 000 000,00 |
 | GOSAFE_RAIL | Global Safety Management Framework for RAIL Operations | S2R-OC-CCA-04-2015 | 01/10/2016 - 30/09/2019 | € 1 298 750,00 |
 | IMPACT-1 | Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 1 | S2R-CFM-CCA-01-2015 | 01/09/2016 - 28/02/2018 | € 886 819,00 |
 | IMPACT-2 | Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 2 | S2R-CFM-CCA-01-2017 | 01/09/2017 - 31/08/2022 | € 7 102 821,00 |
 | IN2DREAMS | IN2DREAMS (INtelligent solutions 2ward the Development of Railway Energy and Asset Management Systems in Europe) | H2020-S2RJU-OC-2017 | 01/09/2017 - 31/08/2019 | € 2 195 715,00 |
 | IN2SMART | Intelligent Innovative Smart Maintenance of Assets by integRated Technologies | S2R-CFM-IP3-02-2016 | 01/09/2016 - 31/08/2019 | € 16 405 562,56 |
 | IN2STEMPO | Innovative Solutions in Future Stations, Energy Metering and Power Supply | S2R-CFM-IP3-01-2017 | 01/09/2017 - 31/08/2022 | € 13 440 000,00 |
 | IN2TRACK | Research into enhanced tracks, switches and structures | S2R-CFM-IP3-01-2016 | 01/09/2016 - 28/02/2019 | € 6 366 942,00 |
 | IN2TRACK2 | Research into enhanced track and switch and crossing system 2 | S2R-CFM-IP3-01-2018 | 01/11/2018 - 30/04/2021 | € 30 162 671,14 |
 | INNOWAG | INNOvative monitoring and predictive maintenance solutions on lightweight WAGon | S2R-OC-IP5-03-2015 | 01/11/2016 - 30/04/2019 | € 1 500 562,50 |
 | M2O | MAke RAil The HOpe for protecting Nature 2 future OPERATION | S2R-OC-IP5-01-2018 | 01/12/2018 - 30/11/2020 | € 599 955,00 |
 | MAASIVE | Passenger service platform specifications for an enhanced multi-modal transport eco-system including Mobility as a Service (MaaS) | S2R-CFM-IP4-01-2018 | 01/11/2018 - 28/02/2021 | € 11 692 236,26 |
 | MAT4RAIL | Mat4rail | S2R-OC-IP1-01-2017 | 01/10/2017 - 30/09/2019 | € 3 500 000,00 |
 | MISTRAL | Communication Systems for Next-generation Railways | S2R-OC-IP2-03-2015 | 01/11/2016 - 31/10/2018 | € 499 282,50 |
 | MOMIT | MOMIT (Multi-scale observation and monitoring of railway infrastructure threats) | H2020-S2RJU-OC-2017 | 01/09/2017 - 31/08/2019 | € 599 172,50 |
 | MOVINGRAIL | MOving block and VIrtual coupling New Generations of RAIL signalling | S2R-OC-IP2-01-2018 | 01/12/2018 - 31/12/2020 | € 1 299 135,00 |
 | MVDC-ERS | Flexible medium voltage DC electric railway systems | S2R-OC-IPX-03-2018 | 01/12/2018 - 30/11/2021 | € 125 000,00 |
 | MY-TRAC | My-TRAC | S2R-OC-IP4-01-2017 | 01/09/2017 - 31/08/2020 | € 3 494 476,25 |
 | NEAR2050 | Future challenges for the rail sector | S2R-OC-CCA-01-2015 | 01/10/2016 - 31/03/2018 | € 399 891,25 |
 | OPEUS | Modelling and strategies for the assessment and OPtimisation of Energy USage aspects of rail innovation | S2R-OC-CCA-02-2015 | 01/11/2016 - 30/04/2019 | € 797 130,00 |
 | OPTIYARD | OptiYard - Optimised Real-time Yard and Network Management | S2R-OC-IP5-01-2017 | 01/10/2017 - 30/09/2019 | € 1 499 900,00 |
 | PINTA | IP1 Traction TD1 and Brakes TD5 – Phase 1 | S2R-CFM-IP1-01-2016 | 01/09/2016 - 31/12/2018 | € 29 201 993,71 |
 | PINTA2 | IP1 Traction TD1 and Brakes TD5 – Phase 2 | S2R-CFM-IP1-01-2018 | 01/09/2018 - 30/11/2020 | € 28 534 183,73 |
 | PIVOT | Performance improvement for vehicles on track | S2R-CFM-IP1-01-2017 | 01/10/2017 - 30/09/2019 | € 18 901 890,00 |
 | PLASA | Smart Planning and Safety for a safer and more robust European railway sector | S2R-CFM-CCA-03-2015 | 01/09/2016 - 31/08/2018 | € 786 349,00 |
 | PLASA-2 | Smart Planning and Virtual Certification | S2R-CFM-CCA-01-2018 | 01/09/2018 - 31/10/2020 | € 1 853 347,78 |
 | RUN2RAIL | RUN2RAIL | S2R-OC-IP1-02-2017 | 01/09/2017 - 31/08/2019 | € 2 732 463,75 |
 | SAFE4RAIL | SAFE architecture for Robust distributed Application Integration in roLling stock | S2R-OC-IP1-02-2016 | 01/10/2016 - 30/09/2018 | € 6 681 211,25 |
 | SAFE4RAIL-2 | Smart Planning and Virtual Certification | S2R-OC-IP1-01-2018 | 01/10/2018 - 30/04/2021 | € 3 991 632,50 |
 | S-CODE | Switch and Crossing Optimal Design and Evaluation | S2R-OC-IP3-01-2016 | 01/11/2016 - 31/10/2019 | € 4 999 771,25 |
 | SHIFT2MAAS | Shift2Rail IP4 enabling Mobility as a Service and seamless passenger experience | S2R-OC-IP4-02-2018 | 01/12/2018 - 31/12/2020 | € 1 499 906,25 |
 | SMART | Smart Automation of Rail Transport | S2R-OC-IP5-01-2015 | 01/10/2016 - 30/09/2019 | € 999 598,75 |
 | SMARTE | SMaRTE - Smart Maintenance and the Rail Traveller Experience | S2R-OC-CCA-01-2017 | 01/09/2017 - 31/08/2019 | € 769 958,75 |
 | SPRINT | Semantics for PerfoRmant and scalable INteroperability of multimodal Transport | S2R-OC-IP4-01-2018 | 01/12/2018 - 31/12/2020 | € 1 999 500,00 |
 | ST4RT | Semantic Transformations for Rail Transportation | S2R-OC-IP4-02-2016 | 01/11/2016 - 31/10/2018 | € 1 000 000,00 |
 | TER4RAIL | Transversal Exploratory Research Activities for Railway | S2R-OC-IPX-02-2018 | 01/12/2018 - 30/11/2020 | € 499 992,50 |
 | VITE | Virtualisation of the testing environment | S2R-OC-IP2-02-2015 | 01/11/2016 - 31/10/2018 | € 1 008 826,25 |
 | X2RAIL-1 | Start-up activities for Advanced Signalling and Automation Systems | S2R-CFM-IP2-01-2015 | 01/09/2016 - 31/08/2019 | € 45 003 870,33 |
 | X2RAIL-2 | Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions | S2R-CFM-IP2-01-2017 | 01/09/2017 - 31/08/2020 | € 30 152 828,03 |
 | X2RAIL-3 | Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication | S2R-CFM-IP2-01-2018 | 01/12/2018 - 30/11/2021 | € 38 885 434,82 |