Cost-Efficient and Reliable High-Capacity Infrastructure

IP Coordinator: Felicity Osborn - NR

Overview


Topic:
S2R-OC-IP3-01-2017
Total Project Value:
€ 2 195 715,00
Duration:
from 01/09/2017 to 31/10/2019
S2R (Of H2020) co-funding:
€ 2 195 715,00
Coordinator:
Stefanos Gogos
UNION DES INDUSTRIES FERROVIAIRES EUROPEENNES - UNIFE
Complementary projects:
Project website:

Objective

In2Dreams has been designed to answer the challenges related to the technology development and demonstrator implementation in order to realise:

  • A non-intrusive Smart Metering sensor network at Railway System level.
  • An open system and interface for data collection, aggregation and analysis in an open source Operational Data Management (ODM) Platform.
  • A set of User Applications design and specifications to exploit the energy analysis process, as well as other possible improvements such as preventive maintenance.

To address those challenges the work of IN2DREAMS is structured in two distinct Work Streams (WS):

WS 1 – Management of Energy-related Data. It aims to remove the current limitations of Railway Energy Management Systems (REMS), by making these capable of supporting a much wider array of requirements by offering a solution able to flexibly adapt to different energy and asset management application requirements. This work is directly related to the Technical Demonstrator TD3.10: Smart Metering for Railway Distributed Energy Resource Management System.

WS 2 – Management of Asset-related Data. It aims to define the necessary IT solutions and related methodologies for business security, economic sustainability and decision support in the field of data processing and analytics in railway applications for asset management. This work is directly related to the Technical Demonstrator TD3.6: Dynamic Railway Information Management System (DRIMS).

The structure of the work and the link to the S2R Technical Demonstrators is illustrated below:

Results and Publications

D2.1 IN2DREAMS SERVICES, USE CASES AND REQUIREMENTS

Download

D2.2 On-board network architecture and dimensioning

Download

D2.3 Ground to OSS communication platform

Download

D4.1 The Data Transactions model in railways ecosystems

Download

D4.3 ProofofConceptofaSmartContract

Download

D4.5 Legal aspect for smart contract adoption

Download

D5.1 Data Analycs Scenarios

Download

D5.3 VisualAnalycsofRailwayDataandModels

Download

D5.4 Rule-based and Visual analytics knowledge extraction demonstrator

Download

D6.1 Analytics platform

Download

D6.4 Operations optimisation

Download

D7.1 Set-up public website

Download

D7.4 Dissemination and Exploitation activities report

Download

All deliverables, results and publications herewith provided reflects only the author's view and the S2R JU is not responsible for any use that may be made of the information it contains.

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No: 777596