| 4SECURAIL | FORMAL METHODS AND CSIRT FOR THE RAILWAY SECTOR | S2R-OC-IP2-01-2019 | 01/12/2019 - 30/11/2021 | € 549 875,00 |
| AB4RAIL | Alternative Bearers for Rail | S2R-OC-IP2-02-2020 | 01/01/2021 - 31/12/2022 | € 349 926,25 |
| ARCC | Automated Rail Cargo Consortium: Rail freight automation research activities to boost levels of quality, efficiency and cost effectiveness in all areas of rail freight operations | S2R-CFM-IP5-02-2015 | 01/09/2016 - 30/04/2021 | € 3 600 360,00 |
| ASSETS4RAIL | Measuring, monitoring and data handling for railway assets; bridges, tunnels, tracks and safety systems | S2R-OC-IP3-01-2018 | 01/12/2018 - 31/12/2021 | € 5 506 631,25 |
| ASTRAIL | ASTRAIL | H2020-S2RJU-OC-2017 | 01/09/2017 - 31/10/2019 | € 1 797 307,50 |
| ATTRACKTIVE | Advanced Travel Companion and Tracking Services | S2R-CFM-IP4-02-2015 | 01/09/2016 - 31/05/2019 | € 5 256 030,00 |
| B4CM | Blockchains as a Distributed Ledger for Attribution of RCM Data in Rail | S2R-OC-IPX-03-2018 | 01/12/2018 - 30/11/2022 | € 124 951,25 |
| BENRAIL | Benefits at rail, top down holistic approach of impact and benefits to make rail attractive for stakeholders | S2R-OC-CCA-01-2021 | 01/10/2021 - 30/06/2022 | € 169 985,00 |
| CARBODIN | CAR BODY SHELLS, DOORS AND INTERIORS | S2R-OC-IP1-01-2019 | 01/12/2019 - 28/02/2022 | € 3 549 291,25 |
| CO-ACTIVE | CO-modal journey re-ACcommodation on associated Travel serVices | S2R-CFM-IP4-01-2015 | 01/09/2016 - 31/05/2019 | € 7 621 915,43 |
| COHESIVE | COHErent Setup and Demonstration of Integrated Travel SerVices | S2R-CFM-IP4-02-2017 | 01/09/2017 - 31/12/2022 | € 4 039 491,45 |
| CONNECTA | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS and brAkes. Phase 1. | S2R-CFM-IP1-02-2016 | 01/09/2016 - 30/09/2018 | € 12 333 045,70 |
| CONNECTA-2 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS. PhAse 2. | S2R-CFM-IP1-02-2018 | 01/10/2018 - 31/07/2021 | € 9 687 622,39 |
| CONNECTA-3 | CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3 | S2R-CFM-IP1-02-2020 | 01/12/2020 - 31/07/2023 | € 8 973 662,69 |
| CONNECTIVE | Connecting and Analysing the Digital Transport Ecosystem | S2R-CFM-IP4-01-2017 | 01/09/2017 - 30/06/2023 | € 7 906 243,00 |
| CYRAIL | Cybersecurity in the RAILway sector | S2R-OC-IP2-01-2015 | 01/10/2016 - 30/09/2018 | € 1 498 150,00 |
| DACCELERATE | Accelerated DAC transformation to full digital rail freight operations in Europe | S2R-OC-IP5-01-2021 | 01/06/2021 - 31/12/2022 | € 2 171 998,02 |
| DAYDREAMS | Development of prescriptive AnalYtics baseD on aRtificial intElligence for iAMS | S2R-OC-IP3-02-2020 | 01/12/2020 - 31/05/2023 | € 1 709 875,00 |
| DESTINATE | Decision supporting tools for implementation of cost-efficient railway noise abatement measures | S2R-OC-CCA-03-2015 | 01/11/2016 - 31/10/2018 | € 1 271 812,50 |
| DYNAFREIGHT | Innovative technical solutions for improved train DYNAmics and operation of longer FREIGHt Trains | S2R-OC-IP5-02-2015 | 01/11/2016 - 30/06/2018 | € 999 822,50 |
| EMULRADIO4RAIL | EMULATION OF RADIO ACCESS TECHNOLOGIES FOR RAILWAY COMMUNICATIONS | S2R-OC-IP2-03-2018 | 01/12/2018 - 31/12/2020 | € 748 097,50 |
| ETALON | ETALON | S2R-OC-IP2-02-2017 | 01/09/2017 - 29/02/2020 | € 1 699 998,75 |
| EXTENSIVE | Extending the attractiveness of transport for end user and extending IP4 to SaaS solutions. | S2R-CFM-IP4-01-2020 | 01/12/2020 - 30/06/2023 | € 11 308 534,27 |
| FAIRSTATIONS | Fair Stations | S2R-OC-IP3-01-2017 | 01/09/2017 - 31/12/2019 | € 1 199 875,00 |
| FFL4E | Future Freight Loco for Europe | S2R-CFM-IP5-03-2015 | 01/09/2016 - 31/07/2019 | € 3 375 017,00 |
| FINE 1 | Future Improvement for Energy and Noise | S2R-CFM-CCA-02-2015 | 01/09/2016 - 31/10/2019 | € 3 017 281,68 |
| FINE-2 | Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail | S2R-CFM-CCA-01-2019 | 01/12/2019 - 31/05/2023 | € 8 179 973,07 |
| FLEX-RAIL | Paradigm shifts for railway – Technology uptake strategies for a lean, integrated and flexible railway system | S2R-OC-IPX-01-2018 | 01/12/2018 - 30/06/2021 | € 1 099 230,00 |
| FR8HUB | Real time information applications and energy efficient solutions for rail freight | S2R-CFM-IP5-01-2017 | 01/09/2017 - 28/02/2021 | € 9 900 990,00 |
| FR8RAIL | Development of Functional Requirements for Sustainable and Attractive European Rail Freight | S2R-CFM-IP5-01-2015 | 01/09/2016 - 31/08/2019 | € 7 826 783,00 |
| FR8RAIL II | Digitalization and Automation of Freight Rail | S2R-CFM-IP5-01-2018 | 01/05/2018 - 31/12/2022 | € 12 450 389,86 |
| FR8RAIL III | Smart data-based assets and efficient rail freight operation | S2R-CFM-IP5-01-2019 | 01/09/2019 - 30/06/2023 | € 13 061 601,01 |
| FR8RAIL IV | Use-centric rail freight innovation for Single European Railway Area | S2R-CFM-IP5-01-2020 | 01/07/2020 - 31/03/2023 | € 17 705 027,89 |
| FUNDRES | FUTURE UNIFIED DC RAILWAY ELECTRIFICATION SYSTEM | S2R-OC-IP3-01-2019 | 01/12/2019 - 30/11/2021 | € 749 540,00 |
| GATE4RAIL | GNSS Automated Virtualized Test Environment for RAIL | S2R-OC-IP2-02-2018 | 01/12/2018 - 28/02/2021 | € 1 019 993,75 |
| GEARBODIES | Gearbodies Innovative Technologies for Inspecting Carbodies and for Development of Running | S2R-OC-IP1-03-2020 | 01/12/2020 - 30/06/2023 | € 2 419 968,75 |
| GOF4R | Governance of the Interoperability Framework for Rail and Intermodal Mobility | S2R-OC-IP4-01-2016 | 01/11/2016 - 31/10/2018 | € 2 000 000,00 |
| GOSAFE_RAIL | Global Safety Management Framework for RAIL Operations | S2R-OC- CCA-04-2015 | 01/10/2016 - 30/09/2019 | € 1 298 750,00 |
| HYPERNEX | Hypernex: Ignition of the European Hyperloop Ecosystem | S2R-OC-IPX-01-2020 | 01/12/2020 - 28/02/2022 | € 250 000,00 |
| IMPACT-1 | Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 1 | S2R-CFM-CCA-01-2015 | 01/09/2016 - 30/04/2018 | € 674 958,39 |
| IMPACT-2 | Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 2 | S2R-CFM-CCA-01-2017 | 01/09/2017 - 31/12/2022 | € 7 096 427,80 |
| IN2DREAMS | INtelligent solutions 2ward the Development of Railway Energy and Asset Management Systems in Europe | S2R-OC-IP3-01-2017 | 01/09/2017 - 31/10/2019 | € 2 195 715,00 |
| IN2RAIL | Innovative Intelligent Rail | MG-2.1-2014 | 01/05/2015 - 30/04/2019 | € 17 998 546,00 |
| IN2SMART | Intelligent Innovative Smart Maintenance of Assets by integRated Technologies | S2R-CFM-IP3-02-2016 | 01/09/2016 - 31/10/2019 | € 16 405 562,56 |
| IN2SMART2 | Intelligent Innovative Smart Maintenance of Assets by integRated Technologies 2 | S2R-CFM-IP3-01-2019 | 01/12/2019 - 31/05/2023 | € 23 091 203,50 |
| IN2STEMPO | Innovative Solutions in Future Stations, Energy Metering and Power Supply | S2R-CFM-IP3-01-2017 | 01/09/2017 - 31/03/2023 | € 13 439 977,36 |
| IN2TRACK | Research into enhanced tracks, switches and structures | S2R-CFM-IP3-01-2016 | 01/09/2016 - 30/04/2019 | € 6 324 051,65 |
| IN2TRACK2 | Research into enhanced track and switch and crossing system 2 | S2R-CFM-IP3-01-2018 | 01/11/2018 - 28/02/2022 | € 29 676 014,83 |
| IN2TRACK3 | IN2TRACK3 | S2R-CFM-IP3-01-2020 | 01/01/2021 - 31/12/2023 | € 26 689 979,00 |
| IN2ZONE | The Next Generation of Railway Transition Zones | S2R-OC-IP3-01-2020 | 01/12/2020 - 31/05/2023 | € 1 349 973,75 |
| INNOWAG | INNOvative monitoring and predictive maintenance solutions on lightweight WAGon | S2R-OC-IP5-03-2015 | 01/11/2016 - 30/06/2019 | € 1 500 562,50 |
| IP4MAAS | Shift2Rail IP4 to support the deployment of Mobility as a Service | S2R-OC-IP4-01-2020 | 01/12/2020 - 31/05/2023 | € 2 507 081,25 |
| IT2RAIL | Information Technology for Shift2Rail | MG-2.2-2014 | 01/05/2015 - 30/04/2018 | € 12 025 000,00 |
| LINX4RAIL | System architecture and Conceptual Data Model for railway, common data dictionary and global system modelling specifications | S2R-CFM-IPX-CCA-01-2019 | 01/12/2019 - 30/11/2022 | € 5 216 494,26 |
| LINX4RAIL2 | System Architecture and Conceptual Data Model For Railway, Common Data Dictionary And Global System Modelling Specifications | S2R-CFM-IPX-CCA-02-2020 | 01/12/2020 - 31/05/2023 | € 3 227 375,61 |
| LOCATE | Locomotive bOgie Condition mAinTEnance | S2R-OC-IP5-01-2019 | 01/11/2019 - 30/04/2022 | € 1 499 072,50 |
| M2O | MAke RAil The HOpe for protecting Nature 2 future OPERATION | S2R-OC-IP5-01-2018 | 01/12/2018 - 31/12/2020 | € 599 955,00 |
| MAASIVE | Passenger service platform specifications for an enhanced multi-modal transport eco-system including Mobility as a Service (MaaS) | S2R-CFM-IP4-01-2018 | 01/11/2018 - 31/07/2021 | € 11 692 236,26 |
| MAT4RAIL | Mat4rail | S2R-OC-IP1-01-2017 | 01/10/2017 - 30/09/2019 | € 3 495 216,25 |
| MISTRAL | Communication Systems for Next-generation Railways | S2R-OC-IP2-03-2015 | 01/11/2016 - 31/10/2018 | € 499 282,50 |
| MOMIT | MOMIT (Multi-scale observation and monitoring of railway infrastructure threats) | S2R-OC-IP3-03-2017 | 01/09/2017 - 31/10/2019 | € 599 172,50 |
| MOVINGRAIL | MOving block and VIrtual coupling New Generations of RAIL signalling | S2R-OC-IP2-01-2018 | 01/12/2018 - 31/12/2020 | € 1 298 135,00 |
| MVDC-ERS | Flexible medium voltage DC electric railway systems | S2R-OC-IPX-03-2018 | 01/12/2018 - 30/04/2022 | € 125 000,00 |
| MY-TRAC | My-TRAC | S2R-OC-IP4-01-2017 | 01/09/2017 - 31/12/2020 | € 3 494 476,25 |
| NEAR2050 | Future challenges for the rail sector | S2R-OC-CCA-01-2015 | 01/10/2016 - 30/04/2018 | € 399 891,25 |
| NEXTGEAR | NEXT generation methods, concepts and solutions for the design of robust and sustainable running GEAR | S2R-OC-IP1-02-2019 | 01/12/2019 - 28/02/2022 | € 2 573 877,50 |
| OPEUS | Modelling and strategies for the assessment and OPtimisation of Energy USage aspects of rail innovation | S2R-OC-CCA-02-2015 | 01/11/2016 - 31/10/2019 | € 797 130,00 |
| OPTIMA | cOmmunication Platform for TraffIc ManAgement demonstrator | S2R-OC-IP2-02-2019 | 01/12/2019 - 28/02/2023 | € 2 249 897,50 |
| OPTIYARD | OptiYard - Optimised Real-time Yard and Network Management | S2R-OC-IP5-01-2017 | 01/10/2017 - 30/09/2019 | € 1 499 900,00 |
| PERFORMINGRAIL | PERformance-based Formal modelling and Optimal tRaffic Management for movING-block RAILway signalling | S2R-OC-IP2-01-2020 | 01/12/2020 - 30/06/2023 | € 1 335 358,75 |
| PINTA | IP1 Traction TD1 and Brakes TD5 – Phase 1 | S2R-CFM-IP1-01-2016 | 01/09/2016 - 31/12/2018 | € 28 855 184,05 |
| PINTA2 | IP1 Traction TD1 and Brakes TD5 – Phase 2 | S2R-CFM-IP1-01-2018 | 01/09/2018 - 28/02/2021 | € 28 534 183,73 |
| PINTA3 | IP1 Traction TD1 – Phase 3 and HVAC TD8 | S2R-CFM-IP1-01-2020 | 01/12/2020 - 31/05/2023 | € 19 242 343,01 |
| PIVOT | Performance improvement for vehicles on track | S2R-CFM-IP1-01-2017 | 01/10/2017 - 31/12/2019 | € 17 432 052,00 |
| PIVOT2 | Performance Improvement for Vehicles on Track 2 | S2R-CFM-IP1-01-2019 | 01/10/2019 - 31/03/2023 | € 40 155 405,03 |
| PLASA | Smart Planning and Safety for a safer and more robust European railway sector | S2R-CFM-CCA-03-2015 | 01/09/2016 - 31/08/2018 | € 786 349,00 |
| PLASA-2 | Smart Planning and Virtual Certification | S2R-CFM-CCA-01-2018 | 01/09/2018 - 31/12/2020 | € 1 853 347,78 |
| RAILS | ROADMAPS FOR A.I. INTEGRATION IN THE RAIL SECTOR | S2R-OC-IPX-01-2019 | 01/12/2019 - 30/11/2022 | € 299 953,75 |
| RECET4RAIL | RECET4rail Reliable Energy and Cost Efficient Traction system for Railway | S2R-OC-IP1-01-2020 | 01/12/2020 - 30/09/2023 | € 2 300 036,25 |
| RIDE2RAIL | Travel Companion enhancements and RIDE-sharing services synchronised to RAIL and Public Transport | S2R-OC-IP4-01-2019 | 01/12/2019 - 30/04/2023 | € 2 999 993,75 |
| ROLL2RAIL | MG.2.3-2014. New generation of rail vehicles | MG-2.3-2014 | 01/05/2015 - 31/10/2017 | € 16 000 000,00 |
| RUN2RAIL | RUN2RAIL | S2R-OC-IP1-02-2017 | 01/09/2017 - 30/09/2019 | € 2 732 463,75 |
| SAFE4RAIL | SAFE architecture for Robust distributed Application Integration in roLling stock | S2R-OC-IP1-02-2016 | 01/10/2016 - 31/12/2018 | € 6 681 211,25 |
| SAFE4RAIL-2 | Smart Planning and Virtual Certification | S2R-OC-IP1-01-2018 | 01/10/2018 - 31/07/2021 | € 3 991 632,50 |
| SAFE4RAIL-3 | Safe4Rail-3 Advanced safety architecture and components for next generation TCMS in Railways | S2R-OC-IP1-02-2020 | 01/12/2020 - 31/07/2023 | € 6 132 399,18 |
| S-CODE | Switch and Crossing Optimal Design and Evaluation | S2R-OC-IP3-01-2016 | 01/11/2016 - 31/10/2019 | € 4 999 771,25 |
| SHIFT2MAAS | Shift2Rail IP4 enabling Mobility as a Service and seamless passenger experience | S2R-OC-IP4-02-2018 | 01/12/2018 - 30/06/2021 | € 1 499 906,25 |
| SILVARSTAR | SILVARSTAR SoIL Vibration and AuRalisation Software Tools for Application in Railways | S2R-OC-CCA-01-2020 | 01/11/2020 - 28/02/2023 | € 949 999,50 |
| SMART | Smart Automation of Rail Transport | S2R-OC-IP5-01-2015 | 01/10/2016 - 30/09/2019 | € 999 598,75 |
| SMART2 | Advanced integrated obstacle and track intrusion detection system for smart automation of rail transport | S2R-OC-IP5-02-2019 | 01/12/2019 - 30/11/2022 | € 1 708 737,50 |
| SMARTE | SMaRTE - Smart Maintenance and the Rail Traveller Experience | S2R-OC-CCA-01-2017 | 01/09/2017 - 31/10/2019 | € 769 958,75 |
| SMARTRAIL | SMARTRAIL | MG-2.2-2014 | 01/05/2015 - 30/04/2018 | € 5 999 213,00 |
| SPRINT | Semantics for PerfoRmant and scalable INteroperability of multimodal Transport – SPRINT | S2R-OC-IP4-01-2018 | 01/12/2018 - 28/02/2021 | € 1 999 500,00 |
| ST4RT | Semantic Transformations for Rail Transportation | S2R-OC-IP4-02-2016 | 01/11/2016 - 31/10/2018 | € 1 000 000,00 |
| STREAM | Smart Tools for Railway work safEty and performAnce iMprovement | S2R-OC-IP3-03-2020 | 01/12/2020 - 31/05/2023 | € 2 700 000,00 |
| TAURO | Technologies for the AUtonomous Rail Operation | S2R-CFM-IPX-01-2020 | 01/12/2020 - 31/05/2023 | € 4 559 803,03 |
| TER4RAIL | Transversal Exploratory Research Activities for Railway | S2R-OC-IPX-02-2018 | 01/12/2018 - 30/11/2020 | € 499 992,50 |
| TRANSIT | TRAin pass-by Noise Source characterIsation and separation Tools for cost-effective vehicle certification | S2R-OC-CCA-01-2019 | 01/12/2019 - 28/02/2023 | € 1 308 718,75 |
| TRANSLATE4RAIL | Translation for breaking language barriers in the railway field | S2R-OC-IPX-02-2019 | 01/12/2019 - 30/11/2021 | € 248 093,75 |
| VITE | Virtualisation of the testing environment | S2R-OC-IP2-02-2015 | 01/11/2016 - 31/12/2018 | € 947 756,88 |
| X2RAIL-1 | Start-up activities for Advanced Signalling and Automation Systems | S2R-CFM-IP2-01-2015 | 01/09/2016 - 30/06/2021 | € 41 224 381,32 |
| X2RAIL-2 | Enhancing railway signalling systems based on train satellite positioning, on-board safe train integrity, formal methods approach and standard interfaces, enhancing Traffic Management System functions | S2R-CFM-IP2-01-2017 | 01/09/2017 - 30/04/2021 | € 30 152 828,03 |
| X2RAIL-3 | Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication | S2R-CFM-IP2-01-2018 | 01/12/2018 - 30/11/2021 | € 38 728 459,46 |
| X2RAIL-4 | Advanced signalling and automation system - Completion of activities for enhanced automation systems, train integrity, traffic management evolution and smart object controllers | S2R-CFM-IP2-01-2019 | 01/12/2019 - 28/02/2023 | € 41 109 699,98 |
| X2RAIL-5 | Completion of activities for Adaptable Communication, Moving Block, Fail safe Train Localisation (including satellite), Zero on site Testing, Formal Methods and Cyber Security | S2R-CFM-IP2-01-2020 | 01/12/2020 - 31/10/2023 | € 33 890 375,44 |